CKCOG Site Logo
Skip navigation links
Home
Municipal Members
What is the CK-COG
When Do You Need a Building Permit?
Inspections
Resources/Info
Skip navigation links
Home
Municipal Members
Centre County
Northumberland County
Snyder County
Union County
Lycoming County
What is the CK-COG?
What is a "COG"?
CK-COG Services
Our Mission Statement
COG History
Board Members
How to Find Us
Staff
Impact of PA Act 45
PA Labor and Industry
Why a UCC?
When Do You Need a Building Permit?
Residential Building Permits
Specific Requirements for Your Project
Residential Permit Fees
Commercial/Industrial and Multi-Family
Commercial Building Permit Fees
Commercial Plan Review Checklist (PDF)
Municipal Water/Sewer Service
Sewage System Permits
Zoning Permits
FAQ
Inspections
Inspection Scheduling
Approved Electrical Inspectors
Resources and Useful Information
ADA Standards (Reference Only) See ANSI A117.1-2003 for PA Standards
Climatic and Geographic Design Criteria
Downloadable Forms
Educational Resources
Floodplain Management
Helpful Code Hints
Links
Maps/Officials/Regulations
Referenced Standards by Municipality
Utilities
Submit Your Permit Application On-Line

 Commercial and Multi-Family Permits

 

Commercial/Industrial and Multi-Family Dwellings

 

Building Permit Process Overview

Prior to the issuance of a Building Permit to begin any Commercial/Industrial or Multi-Family Dwelling construction, the applicant must obtain all required pre-construction approvals from their local municipality.  Including but not limited to; sewage, planning, land development, subdivision, soil conservation, DEP, Labor & Industry and zoning approvals.  After receiving all other necessary approvals you should submit your plans and the “Application for Plans Examination and Building Permit” for review by the plans examiner in our office. 

Once a permit application and plans have been submitted, the UCC states that "A building code official shall grant or deny a permit application, in whole or in part, within 30 business days of the filing date."  If your application is denied, the reasons for denial will be in writing, identifying the elements of the application which are not in compliance with the relevant provisions of the Uniform Construction Code and ordinance as appropriate and providing a citation to the relevant provisions of the Uniform Construction Code and ordinance as appropriate, and sent to the permit applicant.  This written denial of your application suspends the thirty (30) day time limit and the time limit will not resume until the corrected plans have been re-submitted.

 **THREE COMPLETE SETS OF PLANS WITH A PENNSYLVANIA REGISTERED ARCHITECT OR ENGINEER'S SIGNATURE AND SEAL ARE REQUIRED ON ALL PLANS**

COMPLETE BUILDING REVIEW       ELECTRICAL PLAN REVIEW

FIRE PROTECTION REVIEW   BUILDING PLAN REVIEW

PLUMBING/MECHANICAL REVIEW      SPRINKLER PLAN REVIEW


COMPLETE BUILDING REVIEW:
  •  
 Architectural, Building & Site plans                               
  •  
 Specifications
  •  
 Mechanical/Plumbing/Electrical Plans
  •  
 Structural calculations
  •  
 Soil investigation report
     
ELECTRICAL PLAN REVIEW:
  •  
 Riser diagram or one line drawing
  •  
 Floor layout with branch circuitry
  •  
 Floor layout with branch circuitry
  •  
 Load calculations
  •  
 Detailed materials and size requirements
  •  
 Emergency electrical systems
  •  
 Minimum short circuit rating requirements or fault current availability                
  •  
 Detailed equipment and service grounding

BACK TO TOP

FIRE PROTECTION REVIEW:
(Sprinklers, Standpipes & Alarm Systems)

  •  
Shop drawings (From contractor)
  •  
Hydraulic calculations (If applicable)
  •  
Water data (Current flow test)
  •  
Specifications (If applicable)
  •  
Details and specifications for hood suppression systems over cooking appliances.

 

BACK TO TOP

BUILDING PLAN REVIEW:
  •  
A title block which includes: Type of Construction; Use Group; List of all installed fire protection; List of all design options                               
  •  
Site plan and soil test report
  •  
Complete building plans showing uses of all areas
  •  
All appropriate wall, floor and foundation sections
  •  
Complete door schedule with catalog cuts for all doors and hardware (including locksets)
  •  
Complete window and glazing schedule
Complete window and glazing schedule
Complete interior finish schedule with flame spread ratings
Complete Specifications
Building energy calculations as per IEEC 2006 Energy Requirements
List of all rated assemblies (include a diagram of assembly and design number)
Details showing all handicapped requirements
Occupant load for all areas
Statement indicating shop drawing will be submitted for all fire protection systems
Electrical Plans (Show location of all exit and means of egress lighting)
List of all design loads for the building

Complete information for all special occupancy requirements (open well, high rise and covered mall)

Structural calculations and complete information for all special structures (Skylights, roof, panels, awnings, etc.)

Sequence of operations for all special systems (smoke control, elevator recall) List of all firestopping methods at penetrations. (Include specific materials and installation system numbers)


BACK TO TOP

PLUMBING/MECHANICAL REVIEW:
  •  
Submit manufacturer's installation instructions on the mechanical equipment and appliances
  •  
Submit details showing construction of commercial kitchen hood and duct system
  •  
Submit specifications for commercial kitchen exhaust hood suppression system. Indicate pipe size, minimum and maximum length, number of elbows and installation procedures and tests
  •  
Submit ventilation schedule indicating amount of supply air, exhaust air and outside air
  •  
Submit specifications for fixtures pipe materials, joints and connections for all plumbing systems
  •  
Submit gas piping plans showing location, pipe sizes and material
  •  
Submit plans showing complete water piping system, including all sizes indicate fixture types and locations
  •  
If copper tubing is to be installed, indicate solder for copper tubing for potable water distribution to be lead free solder
  •  
Submit working drawings for the required fire protection, suppression and detection systems when a contractor is chosen
  •  
Submit riser diagram for drainage, waste and vent system
  •  
Provide HVAC plans and smoke detection systems
  •  
Provide 110V outlet for servicing rooftop appliances

 BACK TO TOP

SPRINKLER PLAN REVIEW:

  •  
Water flow test (Include pressures, location, time, date, witness and seasonal adjustment)
  •  
Types of pipes, joints, fittings, dimensions and lengths of pipes
  •  
Indicate sprinkler protection for all areas and square footage per sprinkler
  •  
Number, type and temperature ratings for all sprinklers
  •  
Catalog cuts for special sprinklers
  •  
Building occupancy (describe process or storage commodity)
  •  
Section and plan views of racks or shelving
  •  
Storage heights
  •  
Description of special systems (show valves and all trim)
  •  
Indicate locations of gauges, main drains auxiliary drains and test valves
  •  
Plans showing arrangement, piping drainage threads and height of the Fire Department Connection
  •  
Statements indicating all tests and flushing will be completed
  •  
Hose rack layout
Storage areas complying with NFPA 231 series
Detail and location of all hangers
Hydraulically calculated systems
Complete calculations
Completed sprinkler system summary sheet
Flow diagram showing nodes or reference points

 