Commercial/Industrial and Multi-Family Dwellings
Building Permit Process Overview
Prior to the issuance of a Building Permit to begin any Commercial/Industrial or Multi-Family Dwelling construction, the applicant must obtain all required pre-construction approvals from their local municipality. Including but not limited to; sewage, planning, land development, subdivision, soil conservation, DEP, Labor & Industry and zoning approvals. After receiving all other necessary approvals you should submit your plans and the “Application for Plans Examination and Building Permit” for review by the plans examiner in our office.
Once a permit application and plans have been submitted, the UCC states that "A building code official shall grant or deny a permit application, in whole or in part, within 30 business days of the filing date." If your application is denied, the reasons for denial will be in writing, identifying the elements of the application which are not in compliance with the relevant provisions of the Uniform Construction Code and ordinance as appropriate and providing a citation to the relevant provisions of the Uniform Construction Code and ordinance as appropriate, and sent to the permit applicant. This written denial of your application suspends the thirty (30) day time limit and the time limit will not resume until the corrected plans have been re-submitted.
**THREE COMPLETE SETS OF PLANS WITH A PENNSYLVANIA REGISTERED ARCHITECT OR ENGINEER'S SIGNATURE AND SEAL ARE REQUIRED ON ALL PLANS**
COMPLETE BUILDING REVIEW ELECTRICAL PLAN REVIEW
FIRE PROTECTION REVIEW BUILDING PLAN REVIEW
PLUMBING/MECHANICAL REVIEW SPRINKLER PLAN REVIEW
COMPLETE BUILDING REVIEW:
|
|
|
Architectural, Building & Site plans |
|
|
Specifications |
|
|
Mechanical/Plumbing/Electrical Plans |
|
|
Structural calculations |
|
|
Soil investigation report |
ELECTRICAL PLAN REVIEW:
|
|
|
Riser diagram or one line drawing |
|
|
Floor layout with branch circuitry |
|
|
Floor layout with branch circuitry |
|
|
Load calculations |
|
|
Detailed materials and size requirements |
|
|
Emergency electrical systems |
|
|
Minimum short circuit rating requirements or fault current availability |
|
|
Detailed equipment and service grounding |
|
BACK TO TOP
FIRE PROTECTION REVIEW: (Sprinklers, Standpipes & Alarm Systems)
|
|
|
Shop drawings (From contractor) |
|
|
Hydraulic calculations (If applicable) |
|
|
Water data (Current flow test) |
|
|
Specifications (If applicable) |
|
|
Details and specifications for hood suppression systems over cooking appliances. |
BACK TO TOP
BUILDING PLAN REVIEW:
|
|
|
A title block which includes: Type of Construction; Use Group; List of all installed fire protection; List of all design options |
|
|
Site plan and soil test report |
|
|
Complete building plans showing uses of all areas |
|
|
All appropriate wall, floor and foundation sections |
|
|
Complete door schedule with catalog cuts for all doors and hardware (including locksets) |
|
|
Complete window and glazing schedule |
|
|
Complete window and glazing schedule |
|
|
Complete interior finish schedule with flame spread ratings |
|
|
Complete Specifications |
|
|
Building energy calculations as per IEEC 2006 Energy Requirements |
|
|
List of all rated assemblies (include a diagram of assembly and design number) |
|
|
Details showing all handicapped requirements |
|
|
Occupant load for all areas |
|
|
Statement indicating shop drawing will be submitted for all fire protection systems |
|
|
Electrical Plans (Show location of all exit and means of egress lighting) |
|
|
List of all design loads for the building |
|
|
Complete information for all special occupancy requirements (open well, high rise and covered mall) |
|
|
Structural calculations and complete information for all special structures (Skylights, roof, panels, awnings, etc.) |
|
|
Sequence of operations for all special systems (smoke control, elevator recall) List of all firestopping methods at penetrations. (Include specific materials and installation system numbers) |
BACK TO TOP
PLUMBING/MECHANICAL REVIEW:
|
|
|
Submit manufacturer's installation instructions on the mechanical equipment and appliances |
|
|
Submit details showing construction of commercial kitchen hood and duct system |
|
|
Submit specifications for commercial kitchen exhaust hood suppression system. Indicate pipe size, minimum and maximum length, number of elbows and installation procedures and tests |
|
|
Submit ventilation schedule indicating amount of supply air, exhaust air and outside air |
|
|
Submit specifications for fixtures pipe materials, joints and connections for all plumbing systems |
|
|
Submit gas piping plans showing location, pipe sizes and material |
|
|
Submit plans showing complete water piping system, including all sizes indicate fixture types and locations |
|
|
If copper tubing is to be installed, indicate solder for copper tubing for potable water distribution to be lead free solder |
|
|
Submit working drawings for the required fire protection, suppression and detection systems when a contractor is chosen |
|
|
Submit riser diagram for drainage, waste and vent system |
|
|
Provide HVAC plans and smoke detection systems |
|
|
Provide 110V outlet for servicing rooftop appliances |
BACK TO TOP
|
SPRINKLER PLAN REVIEW:
|
|
|
Water flow test (Include pressures, location, time, date, witness and seasonal adjustment) |
|
|
Types of pipes, joints, fittings, dimensions and lengths of pipes |
|
|
Indicate sprinkler protection for all areas and square footage per sprinkler |
|
|
Number, type and temperature ratings for all sprinklers |
|
|
Catalog cuts for special sprinklers |
|
|
Building occupancy (describe process or storage commodity) |
|
|
Section and plan views of racks or shelving |
|
|
Storage heights |
|
|
Description of special systems (show valves and all trim) |
|
|
Indicate locations of gauges, main drains auxiliary drains and test valves |
|
|
Plans showing arrangement, piping drainage threads and height of the Fire Department Connection |
|
|
Statements indicating all tests and flushing will be completed |
|
|
Hose rack layout |
|
|
Storage areas complying with NFPA 231 series |
|
|
Detail and location of all hangers |
|
|
Hydraulically calculated systems |
|
|
Complete calculations |
|
|
Completed sprinkler system summary sheet |
|
|
Flow diagram showing nodes or reference points |